• Home
  • About Marianne
  • Blog
  • Instagram
  • Project Index
  • Shop

In Between Chaos

Adventures in Trying

  • House & Home
  • Project Plans
  • Flip Houses
  • Life
  • Project Index
  • Instagram

Bath Refresh: Update

March 14, 2017 · Leave a Comment

There’s nothing like the flu to hinder progress!  I’m less than 2 weeks (hopefully!) away from starting on my next flip house, and I thought I would be done with this bathroom by now.  But alas, some aches and pains and some backwards progress have kept me square in the middle of this project.

I did finally make up with my vanity, but we have had a few tiffs since then.

Here’s the list of main projects:

  • Vanity – It’s assembled (thank goodness!)  I was really nervous about making and installi   ng the drawer as well as cutting the shelf on my circular saw.  But it is now in my living room getting painted.  So happy to be finishing it up!
    Vanity ready for paint | inbetweenchaos.com
    Vanity ready for paint | inbetweenchaos.com
  • Herringbone mirror – This is on my workbench as I write this.  I’ve gotten most of the full pieces down, and I’m now cutting the smaller pieces around the edge.  I’m working with a lot smaller pieces than I did with my herringbone fireplace, so it is much more tedious.  But it’s still fun, like putting together a puzzle.
    Herringbone Mirror | inbetweenchaos.com
  • Walls – paint and paneling – Not  much progress here, but I have started taking everything out and getting the outlet covers off.  Next big thing there is removing the wall sink and getting my faux shiplap cut.
  • Interior Shutters – Done!  I’m just waiting to hang, which will be after painting.
    Interior Shutters | inbetweenchaos.com
  • Transom window – The frame and trim is all cut and partially assembled.  Next up is paint.
    Transom Frame | inbetweenchaos.com

Other projects: These are the smaller pieces that I’m hoping to pull together –

  • Shower Rod Cover – I’m hoping to install a reclaimed wood valence to hide the shower curtain rod.  I’ve cleaned up some wood that came from the Rehoboth Beach boardwalk, but I think I need more.  Right now it’s crazy windy, cold, and wet outside! So it may be a while before I can get back out there to scrub down the boards.
  • Shelves – I have plans for two shelves, also from the boardwalk boards.
  • Towel rack – This is an easy one – I just need to get my wood cut.

My biggest chore left is probably convincing my 4 year old to go to Lowe’s with me to get my wall planks.  I have a feeling there may be some bribery involved.  Wish me luck!

 

   

Filed In: Bath, House & Home / Tagged: bath, diy vanity, farmhouse, faux shiplap, transom window, update

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Hello!

Welcome all! In between the chaos of being a scatterbrained mom of 3 and a real estate investor, I love trying new things with my saw, paint brush, camera… I’m a Jane of all trades but master of none. Join me and we can learn together!

Never Miss a Post!

Subscribe to our mailing list

* indicates required




Search

Shop

Wal-Mart.com USA, LLC

Try Amazon Prime Free!

Loving Lately

VigLink badge

Theme by 17th Avenue · Powered by WordPress & Genesis